RESIDENTIAL DEVELOPMENTS​

Countryside Properties
Collection of One, two and three-, four- and five-bedroom properties including detached, semi-detached and terrace houses and flats built in in phases

Brookworth Homes 2021 on a 5-year project
Collection of One-, two- and three-bedroom properties including detached, semi-detached and terrace houses and flats built in in phases

Anderson Group Last phase in 2019
Collection of One, two and three-, four- and five-bedroom properties including detached, semi-detached and terrace houses and flats built in in phases with a community school built as a circular edifice around the properties

Bellway Homes – Ashford
Collection of One, two and three-, four- and five-bedroom properties including detached, semi-detached and terrace houses and flats built in in phases

Jerram Falkus Properties

  • Groundworks for a twin apartment in another location including the excavation for the HXB cell core, ground beams with steps and to the right level to the pile cut off level.
  • A large house extension with the construction of multiple apartments all involving piling, ground beam and relocation of ducts and other drainage services.

STEEL FRAMES CONSTRUCTION

Chatham Grammar School 2020
Steel frame building construction for a Grammar School with 48 foundation pads, 10 tie beams and 51 HD bolts done within weeks ahead of program.

Imperial College, London 2019 – 2020

  • A massive office complex for a popular college with massive construction complexity including lift pit construction and retaining walls in addition to other groundworks involved.
  • Construction of new office complex with groundworks involving cell core and excavation for drainage and other services.
  • 4 Reinforced Concrete teaching blocks in London, SW7 for Imperial College London.

Jerram Falkus

Christopher Hospices Lewisham

  • Canopy construction groundworks for a Hospices with HD bolts as part of the Steel structural foundation while some services were also buried during the works.

Canterbury Cathedral, Canterbury

  • New apartment for visitors
  • Landscaping, pavement and edging, tree pits and drainage services relocation work.

Canterbury Hostels

  • Student hostel worth over £20m comprising of Blocks A, B, C and D and are to be two (2) to three (3) floors from lower the ground all within close to 3000m2 land area.

REINFORCED CONCRETE (RC) FRAME

Weston Homes 2018
Groundworks package for a large-scale new build development of houses and apartments in Maidstone; Blocks A, B, C and D with A, B and C having 6 floors each with a basement car park and Block D having 18 floors.